Abbreviated Form of Agreement Between Owner and Contractor for Construction Projects of Limited Scope Where the Basis of Payment Is a Stipulated Sum

 

Click "Add to Cart" button to purchase document. 
Documents are emailed immediately after purchase. 
You can also browse documents by
title, category, or company... or click here for help finding documents.

 

Title:

Abbreviated Form of Agreement Between Owner and Contractor for Construction Projects of Limited Scope Where the Basis of Payment Is a Stipulated Sum

Entities:

Citibank, NA; Maui Land & Pineapple Co. Inc.; Fletcher Pacific Construction Co., Ltd.; R. T. Tanaka Engineers, Inc.; Maui USA Inc.

Date:

1996

Size:

Preview shows 5KB of 24KB total

Price:

$39

ID:

#143724

 

 

► Real Estate ► AIA Forms ► A107 (1987 Edition)
► Financial
► Consumer ► Food Processing

 

 

Start of Preview




AMERICAN INSTITUTE OF ARCHITECTS



AIA Document A107

Abbreviated Form of Agreement
Between Owner and Contractor

For CONSTRUCTION PROJECTS OF LIMITED SCOPE where
the Basis of Payment is a STIPULATED SUM

1987 EDITION

THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY
IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION

This document includes abbreviated General Conditions and should not be used
with other general conditions. It has been approved and endorsed by The
Associated General Contractors of America.

AGREEMENT

made as of the 5th day of April in the year of Nineteen Hundred and 96.

{TABLE}
{C} {C}
BETWEEN the Owner: MAUI USA, INC.
(Name and address) 505 FRONT STREET, SUITE 231
LAHAINA, HAWAII 96761

and the Contractor: FLETCHER PACIFIC CONSTRUCTION Co., LTD.
(Name and address) 707 RICHARDS STREET, SUITE 400
HONOLULU, HAWAII 96813

The Project is: KAHANA RIDGE SUBDIVISION - MASS GRAVING AND INFRASTRUCTURE
(Name and location) KAHANA, LAHAINA, MAUI, HAWAII

The Architect is: R. T. TANAKA ENGINEERS, INC.
(Name and address) 871 KOLU STREET, SUITE 201
WAILUKU, MAUI, HAWAII 96793
{/TABLE}

The Owner and Contractor agree as set forth below.


ARTICLE I

THE WORK OF THIS CONTRACT

1.1 The Contractor shall execute the entire Work described in the Contract
{PAGE}
Documents, except to the extent specifically indicated in the Contract
Documents to be the responsibility of others, or as follows:


ARTICLE 2

DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION

2.1 The date of commencement is the date from which the Contract Time of
Paragraph 2.2 is measured, and shall be the date of this Agreement, as first
written above, unless a different date is stated below or provision is made
for the date to be fixed in a notice to proceed issued by the Owner.

(Insert the date of commencement, if it differs from the date of this
Agreement or, if applicable, state that the date will be fixed in a notice to
proceed.)

SEE EXHIBIT A

2.2 The Contractor shall achieve Substantial Completion of the entire Work
not later than

(Insert the calendar date or number of calendar days after the date of
commencement. Also insert any requirements for earlier Substantial Completion
of certain portions of the work, if not stated elsewhere in the Contract
Documents.)

SEE EXHIBIT A


, subject to adjustments of this Contract Time as provided in the Contract
Documents.

(Insert provisions, if any, for liquidated damages relating to failure to
complete on time.)

Liquidated damages shall be five-hundred dollars ($500) for each calendar day
that substantial completion is not achieved within the Contract time.


ARTICLE 3

CONTRACT SUM

3.1 The Owner shall pay the Contractor in current funds for the Contractor's
performance of the Contract the Contract Sum of ELEVEN MILLION FOUR HUNDRED
FIFTY SIX THOUSAND and 00/100 Dollars ($11,456,000.00), subject to additions
and deductions as provided in the Contract Documents.

SEE EXHIBIT A.

3.2 The Contract Sum is based upon the following alternates, if any, which
are described in the Contract Documents and are hereby accepted by the Owner:

(State the numbers or other identification of accepted alternates. If
decisions on other alternates are to be made by the Owner subject to the
execution of this Agreement, attach a schedule of such other alternates
showing the amount for each and the date with which that amount is valid.)

1. Included is the furnishing of performance and payment bonds.

2. The following Kahana Ridge Subdivision Mass Grading Change Orders are
incorporated by reference:

Change Order No. 1 dated 8/16/94; Change Order No. 2 dated 8/22/94;

 

End of Preview

 

Home        Intelligence        Services        Subscriptions        News        About Us

Contact Us       Terms of Use       Resend Documents       Shopping Cart

Copyright © 2008 The Consus Group LLC